Case Study

LOCATION
STATUS
VALUE
TYPE

Store Refurbishment

The BWS Parap project delivered a complete internal and external refurbishment of the existing store under an ambitious 8-week construction program. The project required detailed staging to allow the store to continue trading throughout the first four weeks while significant structural works were undertaken, including major concrete and structural floor upgrades.

 

Following the initial live-trading stage, the store entered a four-week shutdown period, allowing 345 Projects to undertake the complete transformation of the building. The scope included new floors, walls and ceilings, comprehensive mechanical, electrical and refrigeration services, shopfitting, signage, external façade and line marking. The refurbishment also incorporated artwork celebrating Parap’s cultural significance as the Cockatoo’s Dreaming Place, providing a connection to Country and the local community.

 

 

Delivering such an extensive scope within a compressed timeframe required meticulous programming, close coordination with BWS, trades and suppliers, and a carefully managed transition from live trading into full store shutdown. The project was successfully completed within the 8-week program, demonstrating 345 Projects’ capability to deliver complex, fast-track retail refurbishments while maintaining safety, quality and operational continuity.

LETS WORK TOGETHER